Property planning guide

Accessible Parking and Striping: A Property Manager’s Checklist

Coordinate accessible stalls, access aisles, slopes, signs and paths of travel with qualified review.

City Service Paving commercial project photography

Review the whole route, not just the symbol

Accessible parking involves more than a pavement stencil. Stall dimensions, access aisles, slope, signs and a usable route to the entrance all matter. Repainting a symbol does not resolve an inaccessible curb or a route blocked by a wheel stop.

Review existing plans and inspection reports with a qualified accessibility professional. California requirements and local permitting can add considerations beyond the federal standards.

Verify counts and layout for the actual facility

Required accessible parking counts use tables and can vary with facility type. Van-accessible requirements and specialty facilities need separate attention. Do not rely on a simple one-per-25 rule for every lot.

Have the responsible professional verify counts, dimensions and applicable requirements before changing the layout. The U.S. Access Board’s parking guide and the current California Building Code are reference points, not substitutes for a property-specific review.

Measure grades before marking stalls

A striping crew cannot solve excessive pavement slope with paint. If the proposed accessible area has grading problems, coordinate concrete or asphalt corrections before laying out the final markings.

Check the connection between access aisles and the route to the building. Consider signs, curb ramps, drainage, vehicle overhang and obstructions that can reduce usable width.

Coordinate approvals and operations

Confirm who is responsible for design, permits, inspection and documentation. Fire-lane markings and circulation changes may require approval from the relevant authority. Keep temporary accessible arrangements in mind during phased work.

If you have received an accessibility report or legal notice, share it with the appropriate professionals. Construction estimates do not constitute legal advice or a certification of the entire property.

Keep records after completion

Retain approved plans, relevant inspection records and photographs. Monitor faded markings, damaged signs and new obstructions during routine property walks. Contact the project contact to discuss construction scope based on the reviewed requirements.

Discuss your property with the project contact

These guides provide planning information, not engineering, legal advice or a property-wide accessibility certification. Project requirements depend on inspection, approved specifications and applicable authorities.

Related planning guides

Call (310) 480-5092 Free Quote