Property planning guide
Accessible Parking and Striping: A Property Manager’s Checklist
Coordinate accessible stalls, access aisles, slopes, signs and paths of travel with qualified review.

Review the whole route, not just the symbol
Accessible parking involves more than a pavement stencil. Stall dimensions, access aisles, slope, signs and a usable route to the entrance all matter. Repainting a symbol does not resolve an inaccessible curb or a route blocked by a wheel stop.
Review existing plans and inspection reports with a qualified accessibility professional. California requirements and local permitting can add considerations beyond the federal standards.
Verify counts and layout for the actual facility
Required accessible parking counts use tables and can vary with facility type. Van-accessible requirements and specialty facilities need separate attention. Do not rely on a simple one-per-25 rule for every lot.
Have the responsible professional verify counts, dimensions and applicable requirements before changing the layout. The U.S. Access Board’s parking guide and the current California Building Code are reference points, not substitutes for a property-specific review.
Measure grades before marking stalls
A striping crew cannot solve excessive pavement slope with paint. If the proposed accessible area has grading problems, coordinate concrete or asphalt corrections before laying out the final markings.
Check the connection between access aisles and the route to the building. Consider signs, curb ramps, drainage, vehicle overhang and obstructions that can reduce usable width.
Coordinate approvals and operations
Confirm who is responsible for design, permits, inspection and documentation. Fire-lane markings and circulation changes may require approval from the relevant authority. Keep temporary accessible arrangements in mind during phased work.
If you have received an accessibility report or legal notice, share it with the appropriate professionals. Construction estimates do not constitute legal advice or a certification of the entire property.
Keep records after completion
Retain approved plans, relevant inspection records and photographs. Monitor faded markings, damaged signs and new obstructions during routine property walks. Contact the project contact to discuss construction scope based on the reviewed requirements.
Discuss your property with the project contact
These guides provide planning information, not engineering, legal advice or a property-wide accessibility certification. Project requirements depend on inspection, approved specifications and applicable authorities.
Related planning guides
- Commercial Parking Lot Paving: A Planning Guide
- Asphalt Repair or Replacement: How to Compare Options
- Preparing a Commercial Property for Seal Coating
- HOA Slurry Seal: Scope, Closures and Resident Notices
- Planning an Asphalt Overlay Without Overlooking the Base
- Commercial Concrete: Planning Sidewalks, Curbs and Pads